BCC Engineering Merges with Heath & Lineback
Learn More
Services
Highway Design
Transportation Structures
Building Structures
Planning
Water Resources
Traffic Engineering Operations
Construction Engineering & Inspection
General Engineering Consultant
Utility Engineering
About
News
Careers
Get In Touch
Menu
Close
Filter by
All
Building Structures
Construction Engineering & Inspection
General Engineering Consultant
Highway Design
Planning
Program Management
TEO
Transportation Structures
Utility Engineering
Water Resources
Mater Brickell Preparatory Academy
City of Doral Stormwater Master Plan Update
I-395 Owner’s Representative – Water Resources
Gateway Expressway & I-275 Interchange – Water Resources
Miami-Dade Expressway Authority GEC
SERPM 7 ABM Model Development
West Lucas Road Reconstruction and Widening
Pump Station No. 7
Brisas del Rio Apartments
Gateway Expressway & I-275 Interchange – Traffic Engineering Operations
I-95 Express Lanes – Phase 3C – TEO
Florida International University Pedestrian Bridge
Senator Villas
City of Sunrise GEC
Widen HEFT from SR 836 to NW 106th St
Bella Isla Apartments
Doral Square Retail Center
North Bay Village North Bay Island Stormwater Pump Station Assessment and Design
Florida Statewide Model (FLSWM)
HEFT Widening & Reconstruction Projects
Pump Station 1002 Rehabilitation
Multilane Reconstruction & Bridge/Structural Design for SR 75 (US 231) from South of Pipeline Road to North of Penny Road
SR 25 Okeechobee Road from East of NW 116th Way to East of NW 87 Ave
SR 826/SR 836 Palmetto & Dolphin Expressway Interchange – Section 5
Ductile Iron Force Mains
Stinson Road Paving and Drainage Improvements
SR 826/SR 836 Interchange – Palmetto Section 5
SR 75 (US 231) From SR 30A to North of Pipeline Road
CEI Services for DB Project I-16 at I-95 Interchange Reconstruction
I-4 Ultimate
I-95 Express Lanes Phase 3C Design-Build – Highway
I-275 Howard Frankland Bridge
I-95 Express Lanes and Ramp Signals – Phase 3A-1
KLA Brickell, Miami
I-95 Express Phase 3C – Design-Build
Osceola Parkway Mainline and Poinciana Boulevard Ramp Toll Facility AET Conversion
PGA Boulevard and US 1
SR 826/I-75 Express Lanes – CEI
SR 713/King’s Highway
City of Doral Parks Bond Program Management
City of Sunrise – Golf Village Infrastructure
SW 10th St. Owner’s Rep
Tampa Bay Regional Transportation Analysis
SR 429/Wekiva Parkway Section 8 from Orange Boulevard to East of Rinehart Road
I-195/SR 112 Corridor Planning Study from 12th Avenue to SR 907/Alton Road
Miami Beach Design, Build, Operation, and Maintenance Services for an ITS and SPS
Blondy Jhune Road Rehabilitation
FDOT D5 Districtwide Quality Assurance Contract
Southern Boulevard (SR 80) Bridge Replacement
Gandy Boulevard
Upgrade of Pump Station 0680
SR 826/I-75 Express Lanes
315 Urban Flats
Gateway Expressway & I-275 Interchange
City of Lauderhill GEC
I-75/SR 826 Managed Lanes Study
City of Lauderhill Stormwater Management and Flood Protection Master Plan
Lauderhill Alternative Water Supply Line
SR 713 Kings Hwy from N of St Lucie Blvd to S of Indrio Rd
Downtown Miami Freight Mobility Study
I-95 Managed Lanes Planning Level Traffic and Revenue Study
Gandy Boulevard – Highway Design
Statewide Structures Review Contract
SR 826/SR 836 Palmetto & Dolphin Expressway Interchange – Section 5 Design-Build – TEO
FDOT D6 Districtwide General Consultant Engineering Services
Bonaventure Water Service Line and Watermain Replacement
HEFT Culvert Hydraulic Analysis
Gallery at River Parc
Doral College Hall
Silver Bluff – Neighborhood Improvement
South Roosevelt Blvd./SR A1A Drainage and Stormwater Pump Station Design
SR 826 / SR 874 Interchange – Palmetto Section 2
Statewide Hurricane Evacuation Study & Transportation Model
“Area N” 48 Inch Water Main
Design Services for SR 713/Kings Highway from SR 70 at Turnpike to N. of l-95
Gateway Expressway & I-275 Interchange
I-95 at PGA Boulevard PD&E Study
I-275 Howard Frankland Bridge – TEO
I-95 Managed Lanes Phase 2
I-95 Managed Lanes Phase 1
Dolphin Station Park-and-Ride Transit Terminal
SW 10th Street and I-95 Connector Design Consultant
Flagler Memorial Bridge Replacement
FDOT D6 Districtwide Bridge Repair/Rehabilitation Plans Preparation Contract
SR 836/I-395 From West of I-95 MacArthur Causeway Bridge – GEC
I-95 Express Lanes Phase 3C Design-Build
Services
Highway Design
Transportation Structures
Building Structures
Planning
Water Resources
Traffic Engineering Operations
Construction Engineering & Inspection
General Engineering Consultant
Utility Engineering
About
News
Careers
Get In Touch