BCC Engineering Merges with Heath & Lineback

The scope of work involvesnecessary infrastructure modifications to support the All-Electronic Tolling (AET) conversion of Osceola Parkway between the pavement joint approximately 1,500 feet east of the mainline toll facility and the ramp taper termini west of the westbound Poinciana Boulevard on-ramp to Osceola Parkway.   

Services to be performed include Signing and Pavement Markings to support the AET conversion between the limits and the installation of an Intelligent Transportation System (ITS) inclusive of a fiber optic network (FON) trunkline, Dynamic Message Sign (DMS) subsystem, and Closed-Circuit Television (CCTV) subsystem along Osceola Parkway from the interchange with Interstate 4 to Dyer Boulevard and along SR 535 (Kissimmee Vineland Road) from south of Kyng’s Heath Road to south of Polynesian Isle Boulevard.  

BCC’s TEO scope includes Design Project Management, Signing and Pavement Marking, ITS, and Tolling. 

Osceola Parkway Mainline and Poinciana Boulevard Ramp Toll Facility All-Electronic Tolling (AET) Conversion

The scope of work involves the necessary infrastructure modifications to support the All-Electronic Tolling (AET) conversion for the Osceola Parkway Mainline and Poinciana Boulevard Ramp Toll Facilities and the deployment of ITS systems along Osceola Parkway.

Services Provided:

Highway Design
Transportation Structures
TEO
Water Resources

Client:

Osceola County Board of County Commissioners

Location:

Osceola County, Florida

Cost :

$8 Million (Design-Build Contract)