![Doral Parks Bond](https://bcceng.com/wp-content/uploads/2021/05/Doral-Parks-Bond.jpg)
The bond funded projects include Doral Central Park, White Course – Walk to Park, Morgan Levy Park, Doral Meadow Park, Trails & Tails Park and Cultural Arts Center. Park improvements consist of green spaces, nature areas, sports fields, play areas, infrastructure, an aquatic facility, community center, multi-purpose rooms, cultural amenities, walking/biking trails, specialty recreation areas, and safety features. The Parks Bond Program will also fund the addition and renovation of a 5-mile multi-purpose trail throughout the city and an elevated pedestrian bridge passing over NW 41st Street along NW 117 Ave.
This Program’s marquee project program is the 82-acre Doral Central Park, which will be the largest park in the city. The Park will include an indoor recreational facility, and aquatics venue with a competition pool, learn to swim pool, splash park and lazy river. Outdoor amenities will include meandering walking paths, tennis courts, basketball courts, baseball/softball diamonds, picnic areas, skate spot and pump track and sensory playscape area. Additional activities that will take advantage of the lake are a wetland trail, canoe/ kayak/ paddle boat launch, lake front trails and a lake front promenade. The Park will have a formal events lawn to serve as the city’s special-events hub with the addition of an open-air amphitheater. All new vehicular traffic pathways, parking and normal and special occasion lighting and landscaping will also surround the park.
BCC is currently providing pre-construction services, project management, and project coordination on the 8 projects that will be constructed over the coming years.
![20180702_DCP Images02](https://bcceng.com/wp-content/uploads/2021/05/20180702_DCP-Images02-scaled.jpg)
![20180702_DCP Images01](https://bcceng.com/wp-content/uploads/2021/05/20180702_DCP-Images01-scaled.jpg)
![20180702_DCP Images04](https://bcceng.com/wp-content/uploads/2021/05/20180702_DCP-Images04-scaled.jpg)
![Morgan Levy Park Ribbon Cutting copy](https://bcceng.com/wp-content/uploads/2021/01/Morgan-Levy-Park-Ribbon-Cutting-copy-scaled.jpg)
![White Course Park Groundbreaking](https://bcceng.com/wp-content/uploads/2021/01/White-Course-Park-Groundbreaking-scaled.jpg)
BCC is part of the Team selected as Program Managers for the City of Doral Parks Bond Program. The City’s residents passed a General Obligation Parks Bond for $150 million that will help fund the construction of future Doral projects.
Services Provided:
GEC
Building Structures
CEI
Planning
Utility Engineering
Water Resources
Client:
City of Doral
Location:
Miami-Dade County, Florida
Cost:
$150 Million (Bond Program Value)