BCC Engineering Merges with Heath & Lineback

Project includes the rehabilitation of lift station 0680. Project scope includes refurbishment of existing 8-foot diameter wet well, installation of two new submersible pumps, piping, and electrical upgrades.

Upgrade of Pump Station 0680

Project includes the rehabilitation of lift station 0680. Project scope includes refurbishment of existing 8-foot diameter wet well, installation of two new submersible pumps, piping, and electrical upgrades.

Services Provided:

Utility Engineering

Client:

Miami-Dade Water & Sewer Department

Location:

Miami, Florida