BCC Engineering Merges with Heath & Lineback

BCC’s scope of work under this contract includes performing all the drainage design, including analyzing and designing the drainage system to provide a 10-year flood protection level of service for the roadway, preparing all applicable drainage plans, and providing environmental permitting support to the Florida Department of Transportation District 6.  The drainage system elements are comprised of a gravity system with pipes ranging from 18 to 46 inches; a stormwater pump station with twin 20,000 gallons per minute pumps (total 40,000 gpm), a standby generator, and panel; a stormwater pollution control structure upstream of the pump station, six injection drainage well downstream of the pump station, and an emergency gravity bypass structure.

South Roosevelt Blvd./SR A1A Drainage and Stormwater Pump Station Design

Engineering design for the reconstruction of SR A1A, a four-lane undivided road running along the southern coast of Key West along Smathers Beach.

Services Provided:

Water Resources

Client:

Florida Department of Transportation, District 6

Location:

Miami, Florida

Cost:

$42 Million (Design-Build-Contract)