BCC Engineering Merges with Heath & Lineback

BCC Engineering is the prime Design Project Manager. BCC’s TEO group provided design and construction support service for S&PM and ITS. 

 

Signing and pavement markings design was developed for 9 miles along I-95 and 2 miles along I-595 encompassing express lanes ingress and egress connections and 9 interchanges connections. Signing and markings at cross streets was also provided.  Coordination with Fort-Lauderdale-Hollywood International Airport was conducted to avoid any encroachment issue into the airport glide path.  

The ITS Scope included multi agency ITS systems, including express lane DMS signs, general use DMS, Arterial DMSs, CCTV incident monitoring, MVDS detection systems, generator backed power system, fiber backbone, wrong way detection, and ramp metering.

I-95 Express Lanes - Phase 3C - TEO

This 11-mile long, $457 million-dollar design-build project, is a critical component of South Florida’s Express Lanes Network and the centerpiece for Broward County by connecting the I-95 and I-595 Express Lanes Systems. This project will complete the I-95 Express Lanes system in the area by providing two continuous Express Lanes in each direction on I-95 and providing direction connections to/from I-95 Express and I-595 to the west.

Services Provided:

Highway Design
Planning
Transportation Structures
Traffic Engineering Operations
Utility Engineering
Water Resources

Client:

Florida Department of Transportation, District 4

Location:

Miami-Dade County, Florida

Cost:

$457 Million (Design-Build Contract)