BCC Engineering Merges with Heath & Lineback

This project includes 3 main components:
SR 690, a new 4-lane tolled expressway connection from US 19 to the west of I-275. The new facility will be an elevated roadway built in the median of existing 118th Avenue North allowing commuters a direct connection.

SR 686A, a new 4 lane elevated tolled expressway from the Bayside Bridge to just west of I-275. Improvements will be built in the median of Roosevelt Boulevard between the Bayside Bridge and Ulmerton Road. A new interchange at Ulmerton Road will be constructed as part of this project and a new roadway will continue south through the old Sunshine Speedway property until it merges with SR 690.

I-275 will be widened to add toll lanes in each direction along the median next to the existing lanes from south of Gandy Boulevard to 4th Street North with a rebuilt interchange at Roosevelt Boulevard.

BCC was the Lead Designer for this project, and provided design services for Structures, Roadway, Drainage, ITS, Signalization and Signing & Pavement Markings.

Gateway Expressway & I-275 Interchange

BCC Engineering is the Lead Designer and Team Manager of this transformational project in east Pinellas County.  The Gateway Expressway project will create two new 2-lane elevated tolled roadways that will provide direct connections between US 19 and I-275 and between the Bayside Bridge (north of 49th Street N) and I-275.

Services Provided:

Highway Design
TEO
Transportation Structures
Water Resources

Client:

Florida Department of Transportation, District 7

Location:

Pinellas County, Florida

Cost:

$545 Million (Design-Build Contract)