Services
Highway Design
Transportation Structures
Active Transportation
Building Structures
Planning
Water Resources
Traffic Engineering Operations
Bridge Asset Management
Construction Engineering & Inspection
General Engineering Consultant
Utility Engineering
About
News
Careers
Work Here
Grow Here
Belong Here
Get In Touch
Menu
Close
Filter by
All
Building Structures
Construction Engineering & Inspection
General Engineering Consultant
Highway Design
Planning
Program Management
TEO
Transportation Structures
Utility Engineering
Water Resources
I-95 Express Lanes Phase 3C Design-Build – Highway
I-95 Managed Lanes Phase 1
PGA Boulevard and US 1
Doral Square Retail Center
City of Sunrise GEC
I-275 Howard Frankland Bridge – TEO
Atlanta Beltline Northeast Corridor
SR 25 Spur East over Back River (Torras Causeway)
SR 25 Okeechobee Road from East of NW 116th Way to East of NW 87 Ave
Florida International University Pedestrian Bridge
SR 826/SR 836 Interchange – Palmetto Section 5
I-85/GA 400 Interchange Ramps and North Fork Creekside Trail Design-Build
SR 429/Wekiva Parkway Section 8 from Orange Boulevard to East of Rinehart Road
SW 10th Street and I-95 Connector Design Consultant
Osceola Parkway Mainline and Poinciana Boulevard Ramp Toll Facility AET Conversion
CEI Services for DB Project I-16 at I-95 Interchange Reconstruction
HEFT Culvert Hydraulic Analysis
Gateway Expressway & I-275 Interchange – Traffic Engineering Operations
Bella Isla Apartments
Gateway Expressway & I-275 Interchange – Water Resources
Downtown Miami Freight Mobility Study
Miami Beach Design, Build, Operation, and Maintenance Services for an ITS and SPS
SR 826/SR 836 Palmetto & Dolphin Expressway Interchange – Section 5 Design-Build – TEO
Statewide Hurricane Evacuation Study & Transportation Model
City of Sunrise – Golf Village Infrastructure
FDOT D6 Districtwide Bridge Repair Rehabilitation Plans Preparation Contract CAR85
I-95 Express Lanes and Ramp Signals – Phase 3A-1
I-95 Express Lanes Phase 3C Design-Build
Miami-Dade Expressway Authority GEC
SR 25/US 17 over Savannah River (Houlihan Bridge)
Clear Creek West SW & Sanitary Sewer Improvements Design-Build
I-95 Express Lanes – Phase 3C – TEO
Professional Services for Structural Engineering Projects
North Bay Village North Bay Island Stormwater Pump Station Assessment and Design
FDOT D6 Districtwide Bridge Repair Rehabilitation Plans Preparation Contract C9331
FDOT D1 Districtwide Structures Design Consultant Contract C9C14
SR 836/I-395 From West of I-95 MacArthur Causeway Bridge – GEC
SR 713/King’s Highway
Stinson Road Paving and Drainage Improvements
I-95 Managed Lanes Phase 2
Widen HEFT from SR 836 to NW 106th St
Statewide Structures Review Contract
Flagler Street Beautification
Senator Villas
Gandy Boulevard – Highway Design
Pump Station 1002 Rehabilitation
FDOT D5 Districtwide Quality Assurance Contract
Broad Avenue over Flint River Bridge
Gateway Expressway & I-275 Interchange
KLA Brickell, Miami
South Roosevelt Blvd./SR A1A Drainage and Stormwater Pump Station Design
West Lucas Road Reconstruction and Widening
SW 10th St. Owner’s Rep
Blondy Jhune Road Rehabilitation
Gandy Boulevard
Spring Street Viaduct Replacement
Florida Statewide Model (FLSWM)
I-4 Ultimate
Follow Me Multi-Use Trail & Pedestrian Overpass at Victory Drive
“Area N” 48 Inch Water Main
I-95 Express Phase 3C – Design-Build
Mitchell Street at Norfolk Southern Railroad
D-B Tampa International Airport SkyConnect Automated People Mover
Tampa Bay Regional Transportation Analysis
FDOT D6 Districtwide General Consultant Engineering Services
SR 826 / SR 874 Interchange – Palmetto Section 2
D-B Orlando International Airport South Expansion and Automated People Mover
SR 826/I-75 Express Lanes – CEI
SR 826/SR 836 Palmetto & Dolphin Expressway Interchange – Section 5
Design Services for SR 713/Kings Highway from SR 70 at Turnpike to N. of l-95
SR 826/I-75 Express Lanes
MARTA Brady Mobility Facility Design-Build
Doral College Hall
City of Doral Parks Bond Program Management
Pump Station No. 7
Mater Brickell Preparatory Academy
FDOT D1 Districtwide Structures Design Consultant Contract CA012
Multilane Reconstruction & Bridge/Structural Design for SR 75 (US 231) from South of Pipeline Road to North of Penny Road
Lauderhill Alternative Water Supply Line
Flagler Memorial Bridge Replacement
I-95 at PGA Boulevard PD&E Study
I-275 Howard Frankland Bridge
Interstate North Parkway and Interstate North Circle
HEFT Widening & Reconstruction Projects
International Boulevard Viaduct Replacement
Buford Highway and Norfolk Southern Railroad over Pleasant Hill Road
I-75 / I-575 Northwest Corridor Design-Build
315 Urban Flats
SERPM 7 ABM Model Development
Brisas del Rio Apartments
Union Grove Road Interchange at I-75
Dolphin Station Park-and-Ride Transit Terminal
Path 400 Multi-Use Trail
FDOT D6 Districtwide Bridge Repair/Rehabilitation Plans Preparation Contract
I-195/SR 112 Corridor Planning Study from 12th Avenue to SR 907/Alton Road
Southern Boulevard (SR 80) Bridge Replacement
I-95 Managed Lanes Planning Level Traffic and Revenue Study
Gateway Expressway & I-275 Interchange
Silver Bluff – Neighborhood Improvement
City of Lauderhill GEC
City of Doral Stormwater Master Plan Update
FDOT D6 Districtwide Bridge Repair Rehabilitation Plans Preparation Contract CA544
D-B Hartsfield-Jackson Atlanta International Airport 5th Runway
Old Seven Mile Bridge Rehabilitation
City of Lauderhill Stormwater Management and Flood Protection Master Plan
Upgrade of Pump Station 0680
I-75/SR 826 Managed Lanes Study
SR 75 (US 231) From SR 30A to North of Pipeline Road
Bonaventure Water Service Line and Watermain Replacement
Ductile Iron Force Mains
SR 713 Kings Hwy from N of St Lucie Blvd to S of Indrio Rd
Gallery at River Parc
I-395 Owner’s Representative – Water Resources
Services
Highway Design
Transportation Structures
Active Transportation
Building Structures
Planning
Water Resources
Traffic Engineering Operations
Bridge Asset Management
Construction Engineering & Inspection
General Engineering Consultant
Utility Engineering
About
News
Careers
Work Here
Grow Here
Belong Here
Get In Touch