BCC Engineering Merges with Heath & Lineback
Learn More
Services
Highway Design
Transportation Structures
Building Structures
Planning
Water Resources
Traffic Engineering Operations
Construction Engineering & Inspection
General Engineering Consultant
Utility Engineering
About
News
Careers
Get In Touch
Menu
Close
Filter by
All
Building Structures
Construction Engineering & Inspection
General Engineering Consultant
Highway Design
Planning
Program Management
TEO
Transportation Structures
Utility Engineering
Water Resources
Bella Isla Apartments
Dolphin Station Park-and-Ride Transit Terminal
Gandy Boulevard – Highway Design
SR 25 Okeechobee Road from East of NW 116th Way to East of NW 87 Ave
I-95 Managed Lanes Planning Level Traffic and Revenue Study
Silver Bluff – Neighborhood Improvement
Brisas del Rio Apartments
Downtown Miami Freight Mobility Study
Stinson Road Paving and Drainage Improvements
Miami-Dade Expressway Authority GEC
SR 75 (US 231) From SR 30A to North of Pipeline Road
South Roosevelt Blvd./SR A1A Drainage and Stormwater Pump Station Design
Bonaventure Water Service Line and Watermain Replacement
SR 836/I-395 From West of I-95 MacArthur Causeway Bridge – GEC
Statewide Structures Review Contract
I-95 Express Lanes Phase 3C Design-Build – Highway
I-95 Managed Lanes Phase 2
SERPM 7 ABM Model Development
Flagler Memorial Bridge Replacement
FDOT D6 Districtwide General Consultant Engineering Services
Upgrade of Pump Station 0680
I-95 at PGA Boulevard PD&E Study
Gateway Expressway & I-275 Interchange
“Area N” 48 Inch Water Main
Pump Station 1002 Rehabilitation
Gallery at River Parc
SR 826/SR 836 Interchange – Palmetto Section 5
Lauderhill Alternative Water Supply Line
SR 429/Wekiva Parkway Section 8 from Orange Boulevard to East of Rinehart Road
Gateway Expressway & I-275 Interchange
Statewide Hurricane Evacuation Study & Transportation Model
I-195/SR 112 Corridor Planning Study from 12th Avenue to SR 907/Alton Road
I-95 Express Phase 3C – Design-Build
Doral College Hall
I-95 Managed Lanes Phase 1
City of Doral Stormwater Master Plan Update
I-95 Express Lanes Phase 3C Design-Build
SW 10th Street and I-95 Connector Design Consultant
HEFT Widening & Reconstruction Projects
FDOT D5 Districtwide Quality Assurance Contract
Gateway Expressway & I-275 Interchange – Traffic Engineering Operations
PGA Boulevard and US 1
SR 826/I-75 Express Lanes
Gandy Boulevard
I-395 Owner’s Representative – Water Resources
City of Doral Parks Bond Program Management
I-4 Ultimate
Doral Square Retail Center
Tampa Bay Regional Transportation Analysis
Widen HEFT from SR 836 to NW 106th St
Miami Beach Design, Build, Operation, and Maintenance Services for an ITS and SPS
HEFT Culvert Hydraulic Analysis
Design Services for SR 713/Kings Highway from SR 70 at Turnpike to N. of l-95
Pump Station No. 7
City of Sunrise GEC
North Bay Village North Bay Island Stormwater Pump Station Assessment and Design
Osceola Parkway Mainline and Poinciana Boulevard Ramp Toll Facility AET Conversion
SW 10th St. Owner’s Rep
City of Sunrise – Golf Village Infrastructure
SR 713/King’s Highway
FDOT D6 Districtwide Bridge Repair/Rehabilitation Plans Preparation Contract
Multilane Reconstruction & Bridge/Structural Design for SR 75 (US 231) from South of Pipeline Road to North of Penny Road
Southern Boulevard (SR 80) Bridge Replacement
SR 713 Kings Hwy from N of St Lucie Blvd to S of Indrio Rd
315 Urban Flats
I-275 Howard Frankland Bridge
City of Lauderhill GEC
Senator Villas
SR 826/I-75 Express Lanes – CEI
Ductile Iron Force Mains
SR 826 / SR 874 Interchange – Palmetto Section 2
Mater Brickell Preparatory Academy
Florida International University Pedestrian Bridge
Blondy Jhune Road Rehabilitation
SR 826/SR 836 Palmetto & Dolphin Expressway Interchange – Section 5
SR 826/SR 836 Palmetto & Dolphin Expressway Interchange – Section 5 Design-Build – TEO
Florida Statewide Model (FLSWM)
I-75/SR 826 Managed Lanes Study
I-275 Howard Frankland Bridge – TEO
I-95 Express Lanes and Ramp Signals – Phase 3A-1
KLA Brickell, Miami
CEI Services for DB Project I-16 at I-95 Interchange Reconstruction
West Lucas Road Reconstruction and Widening
City of Lauderhill Stormwater Management and Flood Protection Master Plan
I-95 Express Lanes – Phase 3C – TEO
Gateway Expressway & I-275 Interchange – Water Resources
Services
Highway Design
Transportation Structures
Building Structures
Planning
Water Resources
Traffic Engineering Operations
Construction Engineering & Inspection
General Engineering Consultant
Utility Engineering
About
News
Careers
Get In Touch