The16@95 Improvement projects include the reconstruction of the directional ramps at the I-16/I-95 Interchange with partial-turbine design ramps and the widening of I-16 (west of I-95 to just east of I-516) from two to three lanes in each direction, all in Chatham County. Additional work on this project includes adding collector-distributor (CD) lanes on I-95 northbound to help eliminate weaving to and from I-16. The project will improve traffic flow and enhance safety along both interstate highways and into Georgia’s growing port in Savannah. The project duration is scheduled to be 1,520 days. BCC has been retained to field the project Quality Assurance Manager and a Project Controls Specialist in support of the Design-Build Teams quality assurance efforts. This Key Personnel will be responsible for the leadership of the overall quality assurance program.
GDOT’s Reconstruction of I-16 @ I-95 in Savannah is a $265 million complex design-build project, featuring the first Turbine Interchange in the State of Georgia.
Services Provided:
CEI
Client:
Georgia Department of Transportation (Savannah Mobility Contractors)
Location:
Chatham County, Georgia