Normandy Shores Bulkhead Wall

Project Info

Project: Normandy Shores Bulkhead Wall – City of Miami Beach, Continuing Services Contract
Client: City of Miami Beach, Florida
Cost: Varies
Location: Miami Beach, Florida

Description: BCC Engineering, Inc. is currently providing professional services to the City of Miami Beach on a continuing services contract on an “As-Needed Basis” for projects where the construction costs do not exceed $2 Million and Studies do not exceed $200,000.

BCC Engineering performed the assessment of an existing bulkhead wall at the City’s Normandy Shores Park. Original bulkhead wall documents were studied to determine the existing construction. A field assessment of the bulkhead wall was performed to establish its current condition. As a result of the assessment, it was decided to design a replacement wall. BCC Engineering obtained the services of a geotechnical engineer to establish soil conditions, the services of a coastal engineer to determine wave and scour loads and the services of a surveyor to establish dimensions and elevations. BCC then performed a structural design of the new wall and secured a building permit, while working with an environmental engineer to secure federal, state and county environmental permits.

Other Task Orders issued to date have included:

  • West Avenue Bridge support
  • Normandy Shores Golf Course
  • Security Beach Access Gates

Back to Top

Notice: Undefined index: HTTP_REFERER in /var/www/wp-content/plugins/wp-back-button/wp-back-button.php on line 80
Back