Alternative Delivery

BCC Engineering has established a reputation for viewing every project as a new challenge, requiring an open-minded, inquisitive perspective. Our design-build practice never accepts the status quo as the starting point, and confidently turns complex plans inside out to create better built designs more cost-effective solutions. Having accomplished hundreds of millions of dollars in project savings, and accelerated delivery times; we are dedicated to the idea of developing better alternatives for Florida's infrastructure. That's the BCC mindset.

Services include, but are not limited to:
  • Design-Build Partnerships
  • Public-Private Partnerships
  • Limited Access Highways
  • Toll Roads
  • Major Highway Bridges
Central Boulevard Design-Build
Dolphin Station Park-and-Ride
Gandy Boulevard
HEFT – Eureka Drive to Killian Parkway
HEFT – Killian Parkway to Sunset Drive
I-95 Express Lanes – Phase 3A-1
Interstate 4 Widening
Palmetto Section 2
Palmetto Section 5
SR 5/US 1 Design-Build
SR 826/I-75 Express Lanes
US-1/SR 5 – 18 Mile Stretch